Our skills in energy generation, transmission and distribution extend from feasibility studies, design and construction supervision of new Hydropower plants and transmission lines. Using the most current technologies, we help our clients develop comprehensive efficiency strategies to reduce energy consumption, develop renewable sources and improve grid reliability and loss reductions.

We serve a broad range of clients in government and industry, implementing complex projects from initial concept to delivery and operation. We have specialist capabilities in power development, strategic planning, power system analysis, power quality, project feasibility development, pre¬bid engineering, detailed design, construction supervision, and project management.

MAJOR PROJECTS

Projects Outside Nepal

•   Environmental and Social Impact of the Isimba Hydropower Project on the Kalagala Off Set Area (183.2 MW), Uganda, Ministry of Energy and Mineral Development/World Bank

•   TA-8630 BHU: Promoting Clean Energy Development in Bhutan-F-002 Renewable/Master Plan (47275-001), Bhutan, Asian Development Bank

•   Independent Engineer (Firm) for the Feasibility Study Phase of the ORIO Mini Hydro Power Project (10- Mini Hydro Power Sites), Uganda, Uganda Energy Credit Capitalisation Company

 

Projects in Nepal

•   Feasibility and Environmental Study of Seti River - 6 (SR-6) Storage Project (276 MW), DoED

•   Feasibility and Environmental Impact Assessment Study of Sunkoshi 2 (1100 MW) and Sunkoshi 3 (500 MW) Hydropower Project, DoED

•   Feasibility Study and EIA Study of Karnali Stage-1 Hydropower Project (300 MW), DoED

•   Feasibility Study and Environmental Impact Assessment of Naumure Multipurpose Project (388 MW), DoED

•   Feasibility and Initial Environmental Examination (IEE) Study of Lower Chameliya Hydropower Project (20 MW), DoED

•   Pre-feasibility Study of Upper Jhimruk Storage Project, DoED

•   Environmental and Social Impact Assessment (ESIA) of Karnali (Chisapani) Multipurpose Project (10,000 MW), DoED

•   Feasibility Study and Initial Environmental Examination (IEE) Study of Pikhuwa Khola Hydropower Project (10 MW), DoED

•   Feasibility and Initial Environment Examination Study of Kawadi Khola Hydropower Project (10 MW), DoED

•   Feasibility Study and Initial Environmental Examination (IEE) Study of Chyadu Khola Hydropower Project (10 MW), DoED

•   Feasibility and Initial Environment Examination Study of Nyaurigad Hydropower Project (10 MW), DoED

•   Feasibility and Initial Environment Examination Study of Bheri Khola Hydropower Project (10 MW), DoED

•   Detailed Engineering Design of SiwaKhola Small Hydropower Project (15 MW), Taplejung District, DoED

•   Detailed Engineering Design of Lower HonguKhola Small Hydropower Project (23.5 MW), Solukhumbu District, DoED

•   Detailed Engineering Design of InkhuKhola Small Hydropower Project (20 MW), Solukhumbu District, DoED

•   Detailed Engineering Design of Budhi Ganga Khola Small Hydrpower (6.2 MW), Bajura District, DoED

•   Feasibility and IEE Study of Lungri Khola Hydropower Project (10MW), Rolpa District, DoED

•   Feasibility Study and EIA of Simbuwa Khola Hydropower Project (53 MW), Taplejung District, DoED

•   Preparation of Inspection Guidelines for Hydropower Plants, Substations & Transmission Lines, DoED

•   Preparation of Powerhouse Design Guidelines of Hydropower Projects, DoED

•   Feasibility Study and Initial Environment Examination (IEE) Study of Myagdi Khola Hydropower Project, Myagdi District (32 MW), Myagdi District, DoED

•   Feasibility Study and Environmental Impact Assessment (EIA) Study of Beni-Kaligandaki Hydropower Project (50MW), Baglung, Parbat and Myagdi Districts, DoED

•   Feasibility Study and Environment Impact Assessment (EIA) Study of Sankhuwa Khola-1 Hydropower Project (30 MW), Sankhuwasawa District, DoED

•   Feasibility Study and Environment Impact Assessment (EIA) Study of Sankhuwa Khola Hydropower Project (25 MW), Sankhuwasawa and Bhojpur District, DoED

•   Detail Survey of Sindabesi-Leknath 33 KV Transmission line form Mijuredanda to Lekhnath Substation, Kaski, Lekhnath, Kaski, NEA

•   Design and Supervision of Rashuwagadi Hydroelectric Project (111 MW), Rashuwagadi, Rashuwagadi Hydropower Company Limited

•   Design and Supervision of Sanjen (upper) (14.5 MW) and Sanjen Hydroelectric Projects (42.5) , Rasuwa, Sanjen Jalvidhyut Company Limited

•   Feasibility Study and Initial environmental Examination (IEE) Study of Iower Chepe Hydorpower Project, Lamjung & Gorkha Dictricts (15 MW), DoED

•   Detail Engineering Study of Maiwa Khola Hydropower Project (16 MW), Rolpa District, DoED

•   Feasibility Study and Initial environmental Examination (IEE) Study of Ikhuwa Khola Hydropower Project (30 MW), Sankhuwasawa District, DoED

•   Preparation of Guidelines for Power System Optimization of Hydropower Projects, Nepal, DoED

•   National Survey of Energy Consumption and Supply Situation of Nepal, WECS

•   ADB TA 7666-NEP, Energy Access and Efficiency Improvement Project II, ADB, Manila

•   Detailed Design of Bheri-Babai Diversion Hydropower Project (48 MW), Banke District, DOI

•   Initial Environment Examination (IEE) Study of Nepal Portion for 400 KV D/C Transmission System for Evacuation of Power from Arun-3 HEP Dhalkebar in Nepal, Nepal, SJVN Ltd, India

•   Detailed Survey of Marshyangdi 132 Kv Transmission Line Corridor Project (75 km), Lamjung and Manang District, NEA, Engineering Services, Project Development Department

•   Detailed survey of Kaligandaki 132 Kv Transmission Line Corridor Project (170km), Lamjung and Manang District, NEA, Engineering Services, Project Development Department

•   Detail Survey & Design of Pathan Khola MHP Bhanbhave-2, Badachaur Gulmi and Khurpa Khola MHP, Hadhade-1 Dhanmyda, Gulmi District, User's Group/ AEPC

•   122 KV Transmission Line Topographical Survey from Hetauda to Barda Ghhat, Makawanpur and Chitwan District, NEA Soil Lab, Swayambhu

•   Feasibility Study & Detail Survey and Design of the Rajamtar Micro hydro Project, Ramechhap District, User's Group /ADB

•   Inspection, Maintenance and Monitoring of the Built Structures of Tsho Rolpa GLOF Risk Reduction Project Area Site and Monitoring of MHP Power Plant (15 KW), Tsho Rolpa, Dolakha District, DHM, Babarmahal Norvegien Fund

•   National Rural and Renewable Energy Programme (NRREP): Impact Study of Community Electrification AEPC/NRREP/CESC/2073/74-14: Professional Indemnity Insurance, Nepal, Alternative Energy Promotion Centre (AEPC)